Take the Power Back

 Own the 112MW Combined Cycle Cogeneration Plant 

Plant Snapshot

Power Specs That Matter

  • Output: 112MW combined cycle (64 MW gas + 59.2 MW steam)
  • Configuration: 1-on-1 GE MS6001FA gas turbine + GE Fitchburg steam turbine + HRSG
  • Delivery: Baseload 24x7 power generation
  • Electrical Delivery: 115 kV, 50Hz
  • Steam Delivery: 20 ton/hr, 1.3 barg superheated
  • Water Treatment: Demin + RO
Turbine

Major System Upgrades

GE Service Record

Picture2
Enhancements
  • Stator full rewind
  • Coil rewinding
  • New rotor with 6FA.01 compressor and refurbished turbine rotor
  • DLN2.6 upgraded to OpFlex Auto Tune for Wobbe Index flexibility
Overhaul
  • DLN2.0 → DLN2.6 combustion system
  • Mark V → Mark VIe control system
  • EX2000 → EX2100e exciter upgrade
  • Full GTG field rewind by GE
Latest Inspection
  • GE Major Inspection completed < 1 year prior to shutdown
  • Preserved according to manufacturer's recommendations

 

Learn More

What’s Included? 

  • Complete asset inventory and equipment specs
  • Generator & turbine datasheets (GE)
  • GE preservation and service reports
  • Environmental and performance profiles
  • Plant layout and flow diagrams ↓ See Example Below ↓
Plant Process

 

 

Is This For You?

Who Should Buy?

  • Looking to scale reliable baseload power with minimal lead time

  • Data center operators looking for immediately available, lower-cost power

  • Engineers or developers integrating steam + power into industrial parks

  • Private equity or utility investors seeking asset-backed ROI

Download Full Brochure

Is This Not What You Are Looking For? 

Search Our Entire Inventory

Want To Know More About

Why International Process Plants?